Connecting North and South

Project description

LEG1 is a HVDC Interconnection Subsea power cable of 2,000 MW capacity amplifiable to 7,000 MW allowing for electricity exchange between Europe and the South-Eastern Mediterranean Countries.

LEG1 presents a new strategic opportunity in creating an electricity exchange between European, Middle-Eastern and African countries.

Through LEG1, the electricity network of emerging countries of the Middle-East will be linked to the European grid before 2020. This will allow export of surplus of electricity from the Middle East into Europe during the winter season and from Europe to the Middle East during the summer season.

More profoundly, Middle East countries will be positioned as the renewable energy powerhouse for Europe for the next hundred years.

It is an integrated project in line with the European Union’s energy and climate objectives which include supporting socio-economic developments in the South/East Mediterranean region and Central and Eastern Africa.

Green Power 2020 was founded by Mr ANBAR (the co-founder and former executive vice president of Medgrid) to develop projects within the energy sector including power generation and grid connections within the European Union, South Eastern Mediterranean and Arab countries.

Mr ANBAR
 

 

 

 

 


Green Power 2020 has completed the initial studies to connect Greece to Libya (Tobruk) and Egypt (Salloum) by a 2,000 MW HVDC Submarine Power Cable (LEG 1).
Underwater surveys have determined the shortest and most economic path through the Mediterranean Sea.
 
The European Network of Transmission System Operators for Electricity (ENTSO-E) has approved all studies on 23 June 2016 and the project was subsequently listed under the Ten-Year Network Development Plan (TYNDP 2016) as Project 284 LEG1.
 
This success has opened the way for investment financing and financial assistance as a future Project of Common Interest (PCI) through the Connecting Europe Facility (CEF).
 

Future Stages:

Integrate LEG 1 to the South Eastern Mediterranean Countries Grid;

Participate in power generation with emphasis on renewables;

Extend the grid to East Africa connecting the Nile basin countries in the framework of the energy internet project;
 